[1]
Sarah Fauzia S. Puspita et al. 2020. Feasibility Study of Construction Additional Production Lines on Jelly Drink Plant at PT XYZ. International Journal of Engineering and Management Research. 10, 4 (Aug. 2020), 51–55. DOI:https://doi.org/10.31033/ijemr.10.4.8.