Sustainable Solution for Shoring Method of Cross-Creek Bridge in Ankeng MRT System in New Taipei City: A Case Study

Authors

  • Tai-Yi Liu Chief Engineer, New Asia Construction and Development Corporation, Taiwan, REPUBLIC OF CHINA
  • Cheng-An Lee Director, Department of Rapid Transit Systems, New Taipei City, Taiwan, REPUBLIC OF CHINA
  • Hong-Kee Tzou Director, Department of Rapid Transit Systems, New Taipei City, Taiwan, REPUBLIC OF CHINA
  • Shiun-Jye Lin Deputy Director, First District Project Office, Department of Taipei MRT system, Taiwan, REPUBLIC OF CHINA
  • Mao-Yi Chou Project Manager, Department of Rapid Transit Systems, New Taipei City, Taiwan, REPUBLIC OF CHINA
  • Ke-Fan Jhan Leader Engineer, New Asia Construction and Development Corporation, Taiwan, REPUBLIC OF CHINA

DOI:

https://doi.org/10.31033/ijemr.11.1.3

Keywords:

Ankeng Light Rail MRT System (ALRMS), Sustainable Solution, Shoring Method, U7box Girder, Erbads Creek

Abstract

In the Ankeng Light Rail MRT system (ALRMS) project, the U7 box girder passes crossing the Erbads creek and needs a temporary supporting system for the construction work.  In this study, three temporary shoring system options were proposed to be the construction method.  The D-B Contractor, New Asia construction and Development Corporation, evaluated and selected the optimal choice, The Steel truss frame with supporting beams, to serve as the temporary supporting system.  Compare the deflection of Δmax and Δactual, which are 1.609 cm and 1.59 cm, respectively.  This result presented that the shoring system composed of the H912*302*18*37 supporting beams and steel truss frame had achieved outstanding performance and work to construct the U7 box girder.  This paper presents how the three options are evaluated and the detailed construction processes along with the survey verification for the method.

Downloads

Download data is not yet available.

Downloads

Published

2021-02-27

How to Cite

Tai-Yi Liu, Cheng-An Lee, Hong-Kee Tzou, Shiun-Jye Lin, Mao-Yi Chou, & Ke-Fan Jhan. (2021). Sustainable Solution for Shoring Method of Cross-Creek Bridge in Ankeng MRT System in New Taipei City: A Case Study. International Journal of Engineering and Management Research, 11(1), 18–24. https://doi.org/10.31033/ijemr.11.1.3